|

The ground level extension track turns off left from the left hand main line, swinging up hill between the two trees.
|

Catch-point siding, for engines that fail on the climb.
|
|

A bit further up the line
|

Looking back down from near the top.
|
|

The bridge supports almost finished January 2004
|

Another view over the bridge. The decking has been cut to size and painted, needs fixing on supports, we will soon be able to walk the whole length of the extension.
|
|

Laying down the sheet.
|

Plenty of head clearance.
|
|

Bridge almost complete
|

Location of the new Top Level Station
|
|

Just to prove a 5" loco can climb the incline the wrong way, just approaching the top of the line.
|

Derek and his 5" loco in the new Top Level Station
|
|

Hady Belle testing out the new line.
|

Trying the crossing the other way.
|
|
|