background3
Ground Level Track
DSC_0012

Ground Level Track

Combined 7 1/4” & 5” gauge track
laid out around the raised track and extending through the wood, climbing via a spiral and tunnel.

Main two track station

 

(right) Upper station

 

(below left) Tunnel entrance, seen from over bridge

(below right) Over bridge

DSC_0022
DSC_0024 DSC_0023